Thursday, February 23, 2017

What should we pay attention to in disassembling the batching plant


1 Banning sledge clearance accumulated in the concrete mixer drum of concrete, only can clear it with a chisel;


2 After the shutdown the concrete batching plant/mixing station, and pour water and gravel into the mixing drum for 10 to 15 minutes to clean, and then sort water and pebble out. When cleaning, turn off the power;

3 cleaning should be carried out regularly, regular maintenance procedures for the maintenance and maintenance of the project, such as cleaning, lubrication, oil and so on

No comments:

Post a Comment